Remove the old feed pump motor and install a new 200kW motor to improve the power quality.
Install a ground system that separates the instrument and the power to increase the reliability of the equipment safety system.
Installing a lightning rod system for military service houses, Satun Province
Install ground grid for DCS to improve system reliability
Check and install the aviation signal light circuit on the 60 meter tower.