Dismantled 2 units of Station Service control system equipment and moved to install at Lamphu Ra High Voltage Station.
Major overhaul Gas Heater Bath type, amount of 3 units by disassembling the workpiece measuring equipment come clean Repair damaged spots Assemble back, ready to repaint, keep the parameters both before and after maintenance to measure performance
Installation cable and ladder to MDB cabinet and
Construction of an office building at Betong Green Power Power Plant
Install a solar system Ladder rail with wiring
Install control cabinet, Ladder rail with wiring and electric motor control cable