Our Projects

ONLINE SUPPORT

Tel: +6695-073-6889 , +6699-481-8989
Email: admin@bluewhitesolution.com

Installation of 2 units of Station Service control system at Lam Phu Ra High-Voltage Station

Dismantled 2 units of Station Service control system equipment and moved to install at Lamphu Ra High Voltage Station.

Major overhaul Gas Heater Unit A/B/C at Monitoring station PTT Chana

Major overhaul Gas Heater Bath type, amount of 3 units by disassembling the workpiece measuring equipment come clean Repair damaged spots Assemble back, ready to repaint, keep the parameters both before and after maintenance to measure performance

Installation cable and ladder to MDB cabinet and

Installation cable and ladder to MDB cabinet and

Construction of an office building at Betong Green Power Power Plant

Construction of an office building at Betong Green Power Power Plant

Install Solar cell, Mercator Medical (Thailand) Co.,Ltd.

Install a solar system Ladder rail with wiring

Install electric motor control system, CES Engineering and Maintenance Services Co., Ltd.

Install control cabinet, Ladder rail with wiring and electric motor control cable