Shutdown Prize of wood green energy power plant
Shutdown of the Prize of wood green energy power plant by Blue White Solutions and Services Co., Ltd. has proceeded as follows.
- Calibration Instruments 44 EA.
- PM ectrical cabinet LV MCC/MDB, MV Switch gear 6.3 kV, MV Switch gear 33 kV
- Manufacture and installation of DB moving floor cabinet
- Replace UPS battery size 26Ah, 100Ah, 150Ah
- Repair step grate structure, ready to dismantle Removing and replacing 735 Grate bars
- Removed and replaced.Mounting point of WIFI CCTV camera