Shutdown Prize of wood green energy power plant

Shutdown of the Prize of wood green energy power plant by Blue White Solutions and Services Co., Ltd. has proceeded as follows.

  1. Calibration Instruments 44 EA.
  2. PM ectrical cabinet LV MCC/MDB, MV Switch gear 6.3 kV, MV Switch gear 33 kV
  3. Manufacture and installation of DB moving floor cabinet
  4. Replace UPS battery size 26Ah, 100Ah, 150Ah
  5. Repair step grate structure, ready to dismantle Removing and replacing 735 Grate bars
  6. Removed and replaced.Mounting point of WIFI CCTV camera