ONLINE SUPPORT

Tel: +6695-073-6889 , +6699-481-8989
Email: admin@bluewhitesolution.com

Install 33kV 1/c no.35 sq.mm. XLPE cable and cable termination, EGAT Khlong Ngae High voltage substation

Prepare working area for install HDPE pipe and XLPE underground cable 33kV 1/c 35 sq.mm., Install ground grid, Install cable termination and Install control cable to control box