Shutdown of the Prize of wood green energy power plant by Blue White Solutions and Services Co., Ltd. has proceeded as follows.
Install electrical equipment control system for Rep.115kV KT3A by 115/33kV 50MVA Tie Tx
Prepare working area for install HDPE pipe and XLPE underground cable 33kV 1/c 35 sq.mm., Install ground grid, Install cable termination and Install control cable to control box
Improve 115kV equipment for power supply circuit 1 and circuit 2,High Voltage Substation Phuket 2
Removal and installation of 115kV C-Bank control system
Install electrical equipment control system 500kV Bus Reactor, Bangsapan 2 High Voltage Station